BESS Belgrade 01

Belgrade, Serbia · 10 MWh · 13.0% APY
APY
13.0%
Per annum
Target raise
€3.20M
Opens next quarter
Capacity
10 MWh
5 MW · installed
Chemistry
LFP
battery
Pipeline Not yet open
€3.20M
target raise · opens for fundraising next quarter
StatusSite secured, permitting under way
DepositsNot open yet
See a vault that's already running
Yield breakdownShare of gross yield
13.0%4.5%5.5%3.5%
Depositor APY
Yield paid out to vault depositors
13.0%
Protocol Fee
Operations & protocol treasury
4.5%
Sinking Fund
Reserved to refresh batteries & gear after ~10 yrs of degradation
5.5%
Reserve
Operational buffer for downtime events
3.5%
Use of funds
62%18%12%8%
Battery system & PCS€1.98M
Installation & EPC€576K
Grid connection€384K
Contingency€256K
Project details
Power / Energy5 MW / 10 MWh
ChemistryLFP
Projected annual revenue€832K
Depositor APY13.0%
Receipt tokenmwBEL01 · XRPL MPT
NetworkXRPL · Mainnet
Your position

Connect a wallet to deposit into this vault and track what it earns. Everything on this page is readable without one.